Mikrotunelowanie
na miarę
Twoich potrzeb

We specialize in microtunneling technology, offering services adapted to the individual requirements of each client. We approach every project with full commitment and professionalism, taking into account the specific conditions and expectations of our clients.

Manholes

Manholes for microtunneling

Designed for the construction of pipelines by trenchless methods as start, intermediate, and end chambers

Microtunneling

Highly automated method for trenchless construction of underground pipelines.

Starting and receiving chambers

Made for microtunnelling, drilling, jacking, as well as placement of various types of tanks, pumping stations, pipelines

Technical consulting

We have the required consulting knowledge in trenchless technology, which is constantly growing

About us

Bor-wiert Sp. z o.o. has been operating in the construction market since 2017, specializing in microtunneling technology. Our company has already constructed over 16 kilometers of trenchless tunnels, including many in challenging soil conditions and difficult locations. Our operations cover Poland and other European countries, such as Romania and Italy.

The results of our work
in numbers

Total length of microtunnels completed

Total number of projects completed

Longest single microtunnel

The largest diameter of the microtunnel

Completed projects

Construction of the N-S route on the section from Magazynowa Street to Karola Goduli Street in Ruda Śląska

Project type: Microtuneling DN 1600
Length: 1600/1940 – 75 m
Date of execution: 2026

Drilling using microtunneling technology on the storm sewer network at 32+915 and 32+970 LK137 and the sanitary sewer system for the newly constructed Gliwice Łabędy signal box

Project type: GRP 960 microtunneling – 3 sections
Length: 888/960 – 143 m
Date of execution: 2025

Execution of construction work, preparation of the detailed design, and execution of construction work for the installation of railway traffic control equipment, railway telecommunications network equipment, and a dynamic passenger information system on the Katowice Szopienice Płd. – Katowice – Katowice Piotrowice as part of the project “Work on the main passenger routes (E30 and E65) in the Silesia region, Phase I: Line E65 on the Będzin – Katowice Szopienice Płd. – Katowice – Katowice Piotrowice section”

Project type: GRP 2400 microtunneling – 1 section, GRP 2555 microtunneling – 2 sections
Length: : 2250/2400 – 79 m, 2385/2555 – 139 m
Date of execution: 2025-2026

What sets us apart?

Uncompromising Quality

Innovative Technologies

Wide Range of Projects

International Experience

Reliability and Timeliness

Customized Solutions

Awards and Distinctions

In 2022 we received an award for the construction of a culvert using microtunneling technology under the railroad embankment in Bialystok. Microtunneling GRP DN 1434 – 2250 mm (6 crossings) This task was commissioned by Intercor sp. z o.o.